Wind Solution

Image?

 

In April 2008 Wind Power Support was awarded the UK agency for wind solution by C-bed which at the time was used in the construction on the Lynn And Inner Dowsing wind farm using Grimsby as its home port.

She is now working on the Greater Gabbard wind farm project using Harwich international as its base.

Wind solution normally spends 30 days at sea and can be turned around in a port call In less than 24 hours.

IMO- 6918560                       
Call Sign: 2DKR8                            
Overall Length:  122.71m            
Breadth:  extreme 19.2m moulded 19.2m     
Tonnage Gross-8893
Capacity accommodation for 80 technicians and 30 crew
Wind Solution has 80 cabins with bath/toilets+internet+TV+desk+closet+ minimum 90cm bed

Facilities: Reception, restaurant, lounge with poker tables, games room, fitness room, conference room, movie lounge, TV lounge, 2 x charters office

Wind Solution Images